THABEER CONTRACTING & MAINTENANCE

Construction & Installation

Extending diverse resources, exceptional expertise and a talented workforce THABEER can confidently take-on any project, anywhere, and offer unparalleled efficiency. By leveraging our solid technical capabilities, we excel at project management, delivering to the best interests of our Clients. With a construction and logistics prowess combing with a robust local presence across diverse markets, THABEER facilitates the prompt mobilization of equipment, while our team of highly skilled engineers ensures timely project completions within budget, adding value at every single stage.

Euipmennts
Erection
Power & Control
Cables Works
Automation & Instrumentation Projects
Upgrade &
Retrofit Projects

We are a Vibrant and Dynamic System Integrator with the unique capability of providing comprehensive Design, Engineering, Programming and Fabrication incorporated with Commissioning and Project services and Spares in Drives, PLC/SCADA, RTU, and DCS. Handled more than 50 turnkey Automation projects across the domain of industries i.e. Oil &Gas, Sewage Treatment Plants, Pumping Stations, HVAC & RO plants, Energy and Power.

We strongly affirm that we have extensive networks and expertise technical team who is having vast experience from a variety of industries to handle the below listed PLC/SCADA, DCS, and Safety Systems.

Name Replacement in plant cables and Conduit
Location Jubail
Client SABIC
Project Description Supply, & Replacement of. All. corroded cables and Conduits of 342. Equipment's, & 342 instruments devices and 10.6 KM Cable length, including scaffolding
Name Supply, Replace, Install and commissioning of Transformer
Location
Client
Project Description Remove the Existing & Supply and install new. transformer 10 MVA 13.8KV / 4160V transformer , including all cable modification
Name Shaybah GOSP-4 control system upgrade
Location
Client Saudi Aramco
Project Description Remove, Supply and install 12 Servers from existing 4 server cabinets, Replace KVM switches, 40 station with 70 monitors and 4 TV in 6 consoles, 2 GPS antennas, and supply and laydown cables.
Name SABIC UPS, Rectifier & Battery Charger Master Agreement
Location Saudi Arabia
Client SABIC
Project Description 5 years agreement to provide Replacement, PM, CM & spare parts. for SABIC affiliates in KSA in all UPS and Batteries Brands
Name SABIC VFD & SOFT STARTER Master Agreement
Location Saudi Arabia
Client SABIC
Project Description 5 years agreement to provide Replacement, PM, CM & spare parts. for SABIC affiliates in KSA in all VFD and Soft starter
Name Motor Condition Assessment
Location Rabigh
Client Petro Rabigh
Project Description Complete health assessment testing of MV & HV Motors including testing like
  1. IR, PI & DD
  2. Motor Circuit Analysis
  3. PDCA Analysis
  4. NABL Testing
  5. Tan Delta & Capacitance Analysis
  6. Partial Discharge Analysis
Name Offline VLF Cable Testing
Location Jubail
Client Arrazi, Sabic
Project Description Complete health assessment testing of Power Cables including testing like
  1. IR
  2. TDR
  3. VLF Tan Delta & Capacitance Analysis
  4. VLF Partial Discharge Analysis
Name Motor Condition Assessment
Location Jubail
Client Hadeed, Sabic
Project Description Complete health assessment testing of MV & HV Motors including testing like
  1. Motor Current Signature Analysis
  2. IR, PI & DD
  3. Motor Circuit Analysis
  4. PDCA Analysis
  5. Tan Delta & Capacitance Analysis
  6. Partial Discharge Analysis
Name Motor Condition Assessment
Location Jubail
Client Safco, Sabic
Project Description Complete health assessment testing of MV & HV Motors including testing like
  1. Motor Current Signature Analysis
  2. Shaft Voltage Measurement
  3. IR, PI & DD
  4. Motor Circuit Analysis
  5. PDCA Analysis
  6. Tan Delta & Capacitance Analysis
  7. Partial Discharge Analysis
  8. Ozone
Name Transformer Condition Assessment
Location Qassim
Client Qassim Cement factory
Project Description Complete health assessment testing of Transformer including testing like
  1. Insulation resistance test and PI Test
  2. Magnetic balance test
  3. Voltage ratio test
  4. Magnetizing current test from HV side
  5. Open circuit and measurement of excitation current
  6. Short circuit Test and Measurement of short circuit impedance
  7. Winding resistance test in all tap position.
Name Supply, Installations and Pulling of Cable and termination
Location Jubail
Client Safco, Sabic
Project Description Job includes the proper location existing of supplying Armoured cable, cable trays, laying, tagging, dressing, clamping & final termination of cable at both ends with proper heavy-duty brass glands (sleeved), heavy-duty long barrel Cu lugs of power & grounding cables at both.
This website uses cookies and asks your personal data to enhance your browsing experience. We are committed to protecting your privacy and ensuring your data is handled in compliance with the General Data Protection Regulation (GDPR).